ALM Robot

ALM Robot enables you to run some time-consuming and complicated activities for multiple projects in parallel.

ALM Robot prerequisites

Consider the following before running any activities on target projects in ALM Robot.

  • Back up the projects.

    ALM Robot does not back up the repository, database, or schema. Perform these actions manually.

  • Make sure the project schemas exist on your target database.

  • You can run only one activity at a time.

  • If an activity is stopped during the upgrade activity, the projects may become corrupted. If this occurs, the database administrator should roll back the projects using the backups of database schemas and repositories.

  • If you are using a new database server, back up the schema on the original database server and restore it manually on the target database server.

Back to top

ALM Robot tasks

With ALM Robot, you can perform the following tasks: