Test Options dialog box
This dialog box enables you to set general Scheduler and testing options for the test.
User interface elements are described below:
UI Elements |
Description |
---|---|
Enable Scheduler |
Enables the Scheduler so that you can run the test according to a user-defined schedule. To define a schedule, this option must be selected.
|
Enable IP Spoofer |
After you define multiple IP addresses, and before you run the test, select this option to enable IP spoofing. Note: You must enable IP spoofing before running a test. For details about multiple IP addressing, see Multiple IP addresses. |
Set maximum number of concurrent Vusers |
The maximum number of concurrent Vusers allowed for this test. |
Collate Vuser logs |
Collates Vuser logs from remote load generators after the test ends. This setting is defined per test, and is saved across test runs. This option is selected by default so that the behavior remains consistent with previous versions of the application. Tip: We recommend clearing this option when extended log is enabled for one or more of the groups. |
Disable Default Monitors |
Performance Center host monitors are automatically activated at the start of a test run by default. Select this check box to manually disable host monitors (this can save time in the initialization process when there are many load generators in the test). |
Do not change record Think Time (for Goal Scheduler) |
If selected, Performance Center runs the test using the think time recorded in the script. For details, see Distribute Vusers by goal. Note: If you select this option, you may need to increase the number of Vusers in your scenario in order to reach your target. |