Test Plan Module Icons for Business Process Testing

This section describes the icons available in the Test Plan module for Business Process Testing.

To access

On the ALM sidebar, under Testing, select Test Plan. Select a business process test or flow in the test plan tree.

Important information

  • Tests created in other testing tools can also be included in the Test Plan module tree, and are identified by other icons.
  • Status icons for business process tests and flows are displayed in the Test Plan module tree and in the Status box in the test or flow's Details tab.

See also

The icons in the Test Plan module that are unique to Business Process Testing are described below:

UI Element Description

<green asterisk>.The applicable tab is populated.

Ready status for a flow. All the business components included in the flow have Ready status. This is the least severe status for a flow. For details about this status, see Test Plan Module Fields for Business Process Testing.

Ready status for a test. All the business components included in the business process test have Ready status. This is the least severe status for a test. For details about this status, see Test Plan Module Fields for Business Process Testing.

Maintenance status for a test or flow, or Design status for a flow. For details about this status, see Test Plan Module Fields for Business Process Testing.

Error status for a test or flow. This is the second-most severe status for a test or flow. For details about this status, see Test Plan Module Fields for Business Process Testing.

Outdated status for a test or flow. The test or flow contains obsolete components. A more up-to-date component may be required. This is the most severe status for a test or flow. For details about this status, see Test Plan Module Fields for Business Process Testing.

Group. Identification of a group node. The components and flows displayed hierarchically under the group node are part of a group. For task details on creating groups, see How to Create Business Process Tests and Flows.

Learned. Components created by the BPT Packaged Apps Kit Learn process are identified by this icon. For task details about learning flow, see How to Learn Flows and Business Process Tests.

Reused. Component reuse has been applied to this learned component.

Available from: The Learned Flow Summary dialog box > Advanced Details view. For user interface details, see Learn Summary Page.

Unresolved Changes in Flow. The test or flow was run in change detection mode and its changes are unresolved. A test or flow indicates unresolved changes if it contains components (or flows) with unresolved changes.

Version Control. The test or flow is checked out.

  • Green lock. The test or flow is checked out by the current user.
  • Red lock. The test or flow is checked out by another user.

For details on working with version control in ALM, see the Micro Focus Application Lifecycle Management User Guide: How to Use Version Control.