Work with draft runs

This task describes how to set test runs as draft runs. You can set a test run as a draft in the following ways:

  • Before a test run. You can mark a test that you are running manually as a draft run before performing the test. In the Manual Runner: Run Details page, set the value of the Draft Run field to Y. For user interface details, see Manual Runner Wizard.

  • After a test run. You can mark any test run as a draft by modifying the Draft Run field for the run. For details on accessing run details, see View test runs.