New Tip Baseline dialog box
Use this dialog box to create a new tip baseline.
Use the General tab to identify the baseline and the project or stream.
See Attributes tab/page for how to view and change the baseline attributes.
General tab
Field | Description |
Rules and Guidelines |
---|---|---|
Product |
Select the product associated with this baseline. |
The default is the product for the current project/stream. |
New Baseline ID |
Type a unique name or label for the baseline. |
This name must be unique within the product. Maximum length is 128 characters. |
Type |
Select a baseline type from the list. |
|
Related Requests |
Enter any requests you want to relate to this baseline as In Response To or use the browse button to select them. |
|
Project/Stream Selector |
Choose between:
|
The project determines which item revisions are available for inclusion in the baseline. If you check Use global, the top-level design part determines which item revisions are available for inclusion in the baseline. |
Product |
Select the product whose items you want to include in the baseline. |
The default is the product for the project/stream. The product does not have to match the product ID for the baseline you are creating. |
ID |
Select the project/stream. |
The default is the current project/stream. |
Also baseline attached sub-projects and baselines |
Select this option if you also want to baseline the sub-projects or baselines related to this project. |
This only appears for a project if there are sub-projects/baselines attached to the project. |
See also: