Network Sub-Path Time graph
This graph displays the delay from the source machine to each node along the path according to the elapsed load test scenario time. Each segment is displayed as a separate line with a different color.
X-axis |
Elapsed time since the start of the run. |
Y-axis |
Network delay time. |
Note |
The delays from the source machine to each of the nodes are measured concurrently, yet independently. It is therefore possible that the delay from the source machine to one of the nodes could be greater than the delay for the complete path between the source and destination machines. |
Example
In the following example, four segments are shown. The graph indicates that one segment caused a delay of 70 milliseconds in the sixth minute.
See also: