Post-installation tasks

Now that you have completed installation of the NV components, what's next?

Note: When you set up the LoadRunner/Performance Center testing environment, make sure that the LoadRunner Controller or the Performance Center Host can use port 8182 (default) to communicate with all load generators that will run NV. If this communication is not enabled, the LoadRunner Controller, Performance Center client, and Analysis will not be able to display the "Network Virtualization Charts".