Timeslots Module
Note: For details on reserving hosts for performing maintenance tasks (administrators only), see Manage Timeslots.
To access |
On the My Performance Center navigation bar, select Resources > Timeslots. |
Relevant tasks | |
See also |

This view enables you to view the timeslots in a calendar view. The Calendar view is time-oriented. It allows you to view your timeslots scheduled for the same day, and to get a visual indication of overlapping timeslots.
User interface elements are described below (unlabeled elements are shown in angle brackets):
UI Elements (A-Z) |
Description |
---|---|
![]() |
Create Timeslot. Opens the Add New Timeslot dialog box, enabling you to reserve timeslots for running performance tests. For details, see Add New Timeslot / Edit Timeslot Dialog Box. |
![]() |
Edit Timeslot. Opens the Edit Timeslot dialog box, enabling you to edit a selected timeslot for running performance tests. For details, see Add New Timeslot / Edit Timeslot Dialog Box. |
![]() |
Delete Timeslot. Deletes the selected timeslot. |
![]() |
Abort Timeslot. Aborts the selected timeslot. |
![]() |
Enables you to view timeslots in a flat, non-hierarchical view. Each line in the grid displays a separate timeslot. This view is useful for filtering the timeslots and for viewing the details of multiple timeslots simultaneously. |
Displays the current day only on the calendar. |
|
Displays the date selected in the date selector. |
|
Displays the 5-day work week around the date selected in the date selector. |
|
Displays the full week around the date selected in the date selector. |
|
All Projects / Current Project |
All Projects. Displays timeslots for all projects. Current Project. Displays timeslots for the current project. |
<Date navigator> |
Enables you to select the day/week to display in the main calendar grid. |
My Timeslots for Today |
Displays open and future timeslots that you reserved for the current day in the current project. |
<Calendar> |
Displays the reserved timeslots in your projects in calendar form. The timeslots in the calendar view are color-coded as follows:
|
Summary tab |
Displays a summary of the timeslot selected in the calendar.
Available for Maintenance timeslots only: Available for Data processing timeslots only: Available for Build Verification Suite timeslots only:
|
Host Allocation tab |
Displays the allocation of hosts for the selected timeslot. For future timeslots, the host allocation is a temporary allocation.
|

Enables you to view timeslots in a flat, non-hierarchical view. Each line in the grid displays a separate timeslot. This view is useful for filtering the timeslots and for viewing the details of multiple timeslots simultaneously.
User interface elements are described below (unlabeled elements are shown in angle brackets):
UI Elements |
Description |
---|---|
![]() |
Enables you to view the timeslots in a calendar view.The Calendar view is time-oriented. It allows you to view your timeslots scheduled for the same day, and to get a visual indication of overlapping timeslots. |
![]() |
Opens the Add New Timeslot dialog box, enabling you to reserve timeslots for running performance tests. For details, see Add New Timeslot / Edit Timeslot Dialog Box. |
![]() |
Opens the Edit Timeslot dialog box, enabling you to edit a selected timeslot for running performance tests. For details, see Add New Timeslot / Edit Timeslot Dialog Box. |
![]() |
Aborts the selected timeslot. |
![]() |
Deletes the selected timeslot. |
Add Filter |
Enables you to filter the information being displayed in the timeslots grid. Click the drop-down arrow to apply a filter. |
Last Modified | Enables you to filter the information being displayed in the grid by the last modified date. Click the drop-down arrow to apply a filter. |
ID | A unique numeric ID for the timeslot, assigned automatically by Performance Center. This is a read-only field. |
Valid | indicates whether the timeslot is valid . |
Created By | The user who reserved the timeslot. |
Start Time | The date and time that the timeslot is due to start or started. |
Duration | The duration of the timeslot. |
Hosts | The number of hosts (including Controller) requested for the timeslot. |
Vusers | The number of Vusers reserved for the timeslot. |
Test | The name of the test. |
Run | A unique numeric ID for the run, assigned automatically by Performance Center. This is a read-only field. |
End Time | The date and time that the timeslot ends. |
Event Log | Displays a log of events related to the currently selected timeslot. |
Host Allocation tab |
Displays the allocation of hosts for the selected timeslot. For future timeslots, the host allocation is a temporary allocation.
Note: If an allocated host becomes unavailable, the system attempts to replace the allocated host with another host with similar properties. If no host is available, the timeslot becomes partially allocated and is rendered invalid. |