Configuring a QC Project for the Integration

Here are the required steps to configure each QC project that is to be integrated with PPM:

  1. Enabling a QC Project for the Integration
  2. Creating the Mapping Between OpenText PPM and QC Fields
  3. Mapping the Notes Field in OpenText PPM to an Existing Project.
  4. Deploy the Mapping File to OpenText PPM and QC.

Note: If you want to integrate OpenText PPM requests with both existing and new defects in a QC project, create a new QC project with integration enabled and copy the existing defects (or the desired subset) from the existing project to the new project.