Project Cost Details Report
This report shows the cost details for select project work plans, grouped by labor and non-labor, or operating categorizations.
Note: This report also appears in the Financial Management category.
To run the Project Cost Details report, users must have a Project Management license.
Table 6-3. Project Cost Details report field descriptions
Field Name
|
Description
|
Project Name
|
Specify one or more projects from the projects available on your PPM instance.
|
Project Manager
|
This will limit the report results to only the selected project managers. Select one or more project managers from the users available on your PPM instance.
|
Limit Hierarchy Depth to
|
Specify the level of cost details to show. Type any integer (in the range of 0 to 999,999,999 and without a comma separator). Realistically, however, the range should be from 1 to 10.
A depth of 1 will show costs at the work plan level.
|
Group costs by Capital and Operating
|
Option to select if the costs should be grouped as capital and operating. Choices include:
|
Local Currency
|
Option to select if the costs should be displayed in local currency or in the PPM system base currency. Choices include:
|