2. PM Evaluation

Note that neither of the two possible transitions from step 2 are conditional. The PM will always be presented with the same two choices for the next step.

Tab Field Value
General Step Name 2. PM Evaluation
General Limit Step Duration Selected
General Duration 7 days
General Relative To <Leave blank>
Participants Notification Type Ordered (does not matter because there is only one participant)
Participants To PM
Participants Authorized

PM

Administrators group

Reference to current value of Responsibility property value

Exception Notification To

PM

General Manager

Step Notification Importance Normal
Step Notification Notification Interval 4 days
Step Notification Subject <Leave blank> to use the default step notification message.
Step Notification Body <Leave blank> to use the default step notification message.
Form Options   <Leave blank>
Status Notification To <Leave blank>
Next Steps Condition <otherwise>
Next Steps Next Steps

3. EM Processing

6a. Not Implemented

Dynamic Defaults Property Workflow Status
Dynamic Defaults When equals value 2. PM Evaluation
Dynamic Defaults Assign Property: Comment
Dynamic Defaults Value: Status is 2. PM Evaluation
Workflow Extensions Workflow Extensions <Leave blank>

Back to top