2. PM Evaluation
Note that neither of the two possible transitions from step 2 are conditional. The PM will always be presented with the same two choices for the next step.
Tab | Field | Value |
---|---|---|
General | Step Name | 2. PM Evaluation |
General | Limit Step Duration | Selected
|
General | Duration | 7 days |
General | Relative To | <Leave blank>
|
Participants | Notification Type | Ordered (does not matter because there is only one participant) |
Participants | To | PM |
Participants | Authorized |
PM Administrators group Reference to current value of Responsibility property value |
Exception Notification | To |
PM General Manager |
Step Notification | Importance | Normal
|
Step Notification | Notification Interval | 4 days |
Step Notification | Subject | <Leave blank> to use the default step notification message.
|
Step Notification | Body | <Leave blank> to use the default step notification message.
|
Form Options | <Leave blank>
|
|
Status Notification | To | <Leave blank>
|
Next Steps | Condition | <otherwise>
|
Next Steps | Next Steps |
3. EM Processing 6a. Not Implemented |
Dynamic Defaults | Property | Workflow Status
|
Dynamic Defaults | When equals value | 2. PM Evaluation |
Dynamic Defaults | Assign Property: | Comment
|
Dynamic Defaults | Value: | Status is 2. PM Evaluation |
Workflow Extensions | Workflow Extensions | <Leave blank>
|