New Tip Baseline dialog box
Use the New Tip Baseline dialog box to create a tip baseline.
On the General tab, identify the baseline and the project or stream.
Field | Description |
---|---|
Product |
Select the product associated with this baseline. The default is the product for the current project/stream. |
New Baseline ID |
Type a unique name or label for the baseline. The name must be unique within the product. Maximum length is 128 characters. |
Type |
Select a baseline type from the list. Defaults to the first type in the list. Note: The baseline types are defined in the Administration Console. If user-defined attributes exist for the selected type, use the Attributes tab to view and change them. |
Related Requests |
Enter any requests you want to relate to this baseline as In Response To or use the browse button to select them. |
Project/Stream Selector |
Choose between:
The project determines which item revisions are available for inclusion in the baseline. If you check Use global, the top-level design part determines which item revisions are available for inclusion in the baseline. |
Product |
Select the product whose items you want to include in the baseline. The default is the product for the project/stream. The product does not have to match the product ID for the baseline you are creating. |
ID |
Select the project/stream. The default is the current project/stream. |
Also baseline attached sub-projects and baselines |
Select this option if you also want to baseline the sub-projects or baselines related to this project. Displayed only for a project and only if there are subprojects/baselines attached to the project. |
See also: