Select Test Runs to Trend Report dialog box

This dialog box enables you to add performance test runs to the report.

To access
  1. From the LoadRunner Enterprise navigation toolbar, click and select Performance Trending (under Applications).

  2. On the Performance Trending page, in the Trend Reports grid, click the name of the report to open. The report opens as an additional tab on the LoadRunner Enterprise Dashboard.

  3. On the <report name> Trend Report, select the Trend Overview tab, and click Add runs to trend report.

Important information
  • To add performance test runs to the trend report, there must be a data processor present in your project pool.

  • The process whereby LoadRunner Enterprise extracts the performance test data from Analysis is very labor intensive on the data processor, and may take anywhere from several minutes to over an hour. It is recommended that you use a machine dedicated for this purpose.

  • LoadRunner Enterprise extracts the performance test data from Analysis using a granularity of 16 seconds. This value might be different from the defined granularity in Analysis, and may lead to slight variations when comparing values between Analysis and LoadRunner Enterprise.

User interface elements are described below:

UI Elements

Description

Project A list of available projects from which to select test instances to trend.
Test Set

A list of available test sets from which to select test instances to trend.

Test

The tests contained in the selected test set.

Refresh. Enables you to refresh the dialog box information.

Load Data

Populates the test runs table with all analyzed instances of the selected test.

Run ID

The Run ID.

Run Name

The name of the test run.

Time Range

The duration of the test run that is selected for trending.

Example: If a test run's overall duration is 30 minutes, and the time range is defined as 0-15min, then only the first 15 minutes of the test run will be considered for trending.

Default: The whole test run in selected.


Time Range filter. Opens the Define Time Range dialog box, which enables you to change the defined time range within a test run for trending purposes.

In the Define Time Range dialog box, select one of the following options:

  • Trend Complete Run. Makes all data collected from the beginning to the end of the test run available for trending.

  • Trend Part of Run. Makes only part of the test run available for trending. Select the desired part of the run to trend by entering the start and end times in the Start Time and End Time boxes.

Exec Date

The date and time of the test run.

Duration

The duration (in minutes) of the test run.

Max Vusers

The maximum number of running Vusers during the test run.

Total Transactions Passed

The total number of passed transactions during the test run.

Total Errors

The total number of errors during the test run.

Add

Adds the selected test runs to the trend report.

Back to top