Pre-installation project migration steps
This section describes the pre-installation steps.
Pre-installation project migration considerations
Review and perform the following before migrating existing projects.
-
To work with projects earlier than 12.60, you first need to upgrade to version 12.6x before you can migrate to 2023; direct migration is not supported. You can then upgrade your projects to the latest version. For details, see Upgrade existing projects to newer versions.
-
Migrating projects from one database type in version 12.60 to another database type is not supported.
-
Review the Support Matrix to make sure that you meet the requirements for working with the version being used.
-
Review the list of features that are not available or fully implemented in this release. For details, see Deprecated features.
-
Before beginning the installation, back up the projects, the database, and the repository. For details, see Back up projects in installation.
Note: During the migration process, data is taken in read-only mode; therefore, no changes should occur on the database level.
Upgrade existing projects to newer versions
The following tables describe how to upgrade projects from earlier versions. Note that not all projects can be migrated directly.
| From version: | To latest version: |
|---|---|
| 2020 and later |
For details, see Upgrade projects to the latest version. |
| 12.6x and earlier |
To work with Performance Center/ALM projects in OpenText Enterprise Performance Engineering, you first need to upgrade your projects to version 12.60 before you can migrate them to OpenText Enterprise Performance Engineering. After performing the 12.60 upgrade, migrate the Performance Center/ALM projects to OpenText Enterprise Performance Engineering 2023 (direct migration to a later version is no longer supported). For details, see Migrate projects in the 2023 version of the Help Center. |
Back up projects in installation
Back up all your projects in the existing installation that you plan to migrate. We recommend that you deactivate projects before backing them up.
If you must back up while your project is still active, you must back up the database before the file system. We also recommend backing up the file system as soon as possible after backing up the database.
Note:
-
Before you run the migration process, perform a full backup of your projects that includes the project database schema and the project repository.
-
Version Control: Version control enabled projects cannot be backed up while there are checked out entities. All entities must be checked in to the corresponding version of Quality Center or ALM. To determine if there are checked out entities, see this KB article.
To back up the project database schema on the database server:
-
Microsoft SQL database. To back up the project database schema on the database server, see this KB article.
-
Oracle database. To back up the project database schema on the database server, see this KB article.