Merge Project dialog box

In the Merge Project dialog box, merge two projects A and B into a new project C or into the first project A.

To set project flags and named branches for future revisions, see Set project flags.

On the General tab, specify the projects to be merged:

Field Description

First Project Selector

Select a product and project from the lists.

To use your default project, select Use Default Project

By default, your currently open project is selected.

Second Project Selector Select a product and project as described under First Project Selector.

Target Project Selector

Select a product and project as described under First Project Selector.

If you do not specify a target, the projects are merged into the first project.

Report Only Select to only report whether the proposed merge operation is valid, without performing the merge.

Back to top

See also: